Reading Girls School

Reading

Date

1st April 2016

Value

£475,000

Contractor

Interserve Construction

Architect

Maber Architects

How we did it

This was the first project Elite used the Senior Architectural Systems PURe© thermal window to great effect. 

There were a high number of electrically automated opening windows and a high number of manually operated winding gear opening windows which were supplied by SE Controls.  

Daylighting was a key consideration for this project and this system was chosen to eliminate the need for coupling windows together so to reduce the sight lines for maximum daylight effect.The PURe© multiframe profiles allowed us to manage which side of the profile should be beaded so we could accommodate outward and inward opening windows within the same composite frame. 

The Result

A very neatly finished looking building which through the nature of the windows and SF52 curtain walling was able to brighten up and insulate the building better. 

Products Used

Windows

Windows 

Curtain Wall

Doors

SD